New Pantai Expressway (NPE) Highway
New Pantai Expressway Sdn Bhd (NPESB)
Plaza Tol Pantai Dalam,
Km 10.6, Lebuhraya Baru Pantai,
58200 Wilayah Persekutuan, Kuala Lumpur.
Tel: 03-77838800
Fax: 03-77831111
NPE Infoline: 1-300-88-1010
Email: info.npe@ijm.com
New Pantai Expressway Sdn Bhd (NPESB) a subsidiary of the IJM Corporation Berhad, was awarded by the Government to construct, operate and maintain the New Pantai Highway (also known as the NPE Highway). The concession period is for 33½ years. Development costs for the highway was approximately RM1.3 billion.
NPE Highway is a dual 3-lane carriageway link between Subang Jaya and the existing Seremban Highway, a link between the Federal Highway Route II at Petaling Jaya Selatan and the junction of Taman Maju Jaya, and a dual lane carriageway link between Pantai Dalam and Jalan Bangsar. Tolling commenced on 2nd April 2004. With these links, motorists traveling to and from Subang Jaya and Kuala Lumpur city centre via Jalan Bangsar will find the NPE Highway a more convenient alternative.
The overall design of NPE Highway length of 19.6 km incorporates three toll plazas, which are the Pantai Dalam Toll Plaza, PJS 2 Toll Plaza and PJS 5 Toll Plaza. Further features include 8 interchanges of various designs, 29 bridges (including pedestrian bridges), and two underpasses (passing Federal Highway Route II, near Angkasapuri and along Jalan Subang Utama).
To provide a safer and more efficient ride for its users, the NPE is replete with
the latest equipment including;
– 24 hours Traffic Control and Surveillance System (TCSS) Center
– Variable Message Signage (VMS)
– Close Circuit Television (CCTV)
– Electronic Toll Collection System
NPESB was accredited with ISO 9001:2008 and UKAS in year 2010 for the quality in Service and Management.